Height | 500mm |
---|---|
Width | 40mm |
Length | 1000mm |
S.W.L | 230kg |
Swivels | 300 degrees |
Main Features
- Swivel couplings to attached to scaffold


To Download it click on the button below and follow the installation instructions.

Popular Applications
- Attaches to scaffold and used as a swivel pivot arm for lifting materials on site
Terms & Condtions
Please read our full Hire Contract Conditions here before hiring from Kennards Hire.
In addition, please note the following specific conditions:
- Tower erection procedure to be read prior to erecting scaffold.
- Scaffold more than five metres in height should be erected, maintained, altered and dismantled by a certificated scaffolder.
- All scaffolds are to be erected in accordance with manufacturer's specifications & all scaffolding components must be installed.
CAUTION: Do not approach within 4 metres of overhead low voltage power lines or other electrical hazards. Other factors may require a greater approach distance, check with your local electrical supply authority.
Delivery Information
- We aim to deliver within 2 hours of your selected delivery time.
- All deliveries and pickups must be in a safe area to unload, demonstrate the equipment and complete paperwork.
- Any delivery amount displayed is ‘one-way’ and for one load only. If multiple vehicles are required, we will contact you prior.
More information on our delivery service (including After Hours) and Pick Up information is available here.